Framing has begun with a possible completion date of July 15th, 2024. First picture is facsimile. Appearance could change at builders discretion. 2 car garage will be one full door, not two. Located near the end of a cul-de-sac. Foundation installed to fit a 50'X28" Raised Rand/Split Level with a 2 car garage under. Driveway also installed. Engineering for the lot, septic system and driveway are approved and attached as extra documents. Any choices or upgrades other than builder plans could result in upcharges.